2026 Pricing Guide

Roofing Estimate Calculator & Cost Guide

Real 2025 pricing data to help you bid roofing jobs accurately. Includes cost per square, material prices, and labor rates.

2026 Roofing Costs Per Square (100 sq ft)

Shingle Type Material Only Installed Warranty
3-Tab Shingles
Basic, flat appearance
$90/sq $350/sq 20-25 years
Architectural (Most Common)
Dimensional, textured look
$130/sq $450/sq 30 years
Premium/Designer
Luxury appearance, max durability
$200/sq $650/sq 50 years / Lifetime
Standing Seam Metal
Steel or aluminum panels
$400/sq $1000/sq 40-70 years
Prices are national averages. Actual costs vary by region, roof complexity, and material availability.

Additional Line Items & Costs

Don't forget these when building your estimate.

Tear-off & disposal
$125/square
Remove existing shingles
Deck repair
$75/sheet
Replace damaged plywood
Ice & water shield
$120/roll
Ice & water shield (covers 66 sq ft)
Drip edge
$3.5/LF
Aluminum drip edge
Ridge cap
$65/bundle
Hip and ridge shingles
Synthetic underlayment
$50/roll
Synthetic underlayment (1000 sq ft)
Pipe boots
$25/each
Pipe boot/flashing
Skylight re-flash
$150/each
Re-flash existing skylight
đź’ˇ
Pro tip: Budget 10-15% waste factor for shingles. Steep roofs (7/12+) and complex designs with valleys/dormers need more. Always quote ice & water shield at valleys, eaves, and around penetrations.

Roof Pitch Multipliers

Steeper roofs = more surface area. Use these factors to adjust flat measurements.

Pitch Multiplier Difficulty
3/12 - 4/12 1.03 - 1.05 Easy (walkable)
5/12 - 6/12 1.08 - 1.12 Easy (walkable)
7/12 - 9/12 1.16 - 1.25 Moderate (caution)
10/12 - 12/12 1.30 - 1.41 Steep (equipment needed)

How to use pitch multipliers

Multiply your flat roof measurement by the pitch factor to get actual surface area.

Actual sq ft = Flat sq ft Ă— Pitch multiplier

Example calculation

A 2,000 sq ft footprint with a 7/12 pitch:
2,000 Ă— 1.16 = 2,320 sq ft
= 23.2 squares

Quick Reference: Common Roof Replacement Costs

Small home (15 squares)
$5,500 - $9,000
~1,500 sq ft, architectural shingles
Average home (20-25 squares)
$8,000 - $15,000
~2,000-2,500 sq ft, architectural
Large home (30+ squares)
$12,000 - $25,000
3,000+ sq ft, varies by complexity
Roof repair (small area)
$300 - $1,000
Patch, replace damaged shingles
Leak repair
$400 - $1,500
Find and fix leak source
Ridge vent install
$400 - $800
Cut and install ridge ventilation

How to Estimate a Roofing Job

1

Measure the roof

Get the total square footage from satellite measurement, drone, or physical measurement. Don't forget to apply the pitch multiplier.

2

Count penetrations and features

Note all pipe boots, vents, skylights, chimneys, valleys, hips, and ridges. Each adds material and labor.

3

Calculate materials

Use the squares to calculate shingles, underlayment, and accessories. Add 10-15% waste.

Shingle bundles = Squares Ă— 3 Ă— 1.10 (for waste)
4

Estimate labor

A crew of 3 can typically install 15-25 squares per day on a standard roof. Add time for tear-off, steep pitch, or complexity.

5

Add overhead and profit

Most roofers add 15-25% overhead and 10-15% profit to direct costs. Don't forget insurance, permits, and dumpster rental.

Generate roofing estimates in minutes

SnapScope uses AI to turn your roof photos into detailed estimates—with materials, labor, and your markup. No more manual calculations.

Apple Download SnapScope for iOS

Free to try. No credit card required.

Frequently Asked Questions

How much does a new roof cost per square in 2025?
In 2025, asphalt shingle roofing costs $350-$450 per square installed for architectural shingles. 3-tab shingles run $300-$400 per square. Premium designer shingles cost $500-$700 per square. Metal roofing ranges from $800-$1,200 per square installed.
How many bundles of shingles do I need per square?
Standard 3-bundle shingles require 3 bundles per square. Some heavier architectural shingles come in 4-bundle or 5-bundle coverage. Always check the coverage on the bundle—it should say how many bundles cover one square (100 sq ft).
What markup should roofers charge?
Most roofing contractors add 15-25% for overhead (insurance, equipment, office costs) and 10-15% for profit, totaling 25-40% above direct costs. During storm season with high demand, some contractors charge higher markups. For insurance restoration work, follow the carrier's pricing structure.
How long does it take to install a new roof?
A typical crew of 3-4 experienced roofers can tear off and replace 15-25 squares per day on a standard-pitch roof. An average home (20-25 squares) usually takes 1-2 days. Complex roofs with steep pitches, multiple valleys, or extensive repairs may take 3-4 days.